The 3,000 MW photovoltaic composite project (Phase I: 1,000 MW) supporting the "Ningxia-Hunan DC" new energy base has been equipped with energy storage system devices provided by RealSee, A total of 20 battery cabins for the 50 MW/100 MWh system have been successfully hoisted and installed.


